Contract architecture for storage-integrated renewable projects
Linking generation and storage components across supply, installation and operation contracts.

Adding storage to a generation facility changes the contractual structure as much as the technical design. The boundaries between the battery supplier, the EPC contractor and the O&M provider must be clearly drawn.
Performance commitments and interface risk
Battery capacity degradation requires consistency between performance commitments in the supply contract and operating conditions in the O&M contract. Which party bears interface risk is also a priority question for lenders.
Current rules on licensing and grid connection should be checked for each project. This article is for general information.
This content is for general information and is not a substitute for legal advice.